Waterfall

Thames Tideway Tunnels

Modernising a 150 yearold flood prevention system.

Client: Thames Water, UK


Challenges

  • 150 yr old flood prevention system

  • Sewage overflows into Thames

  • Weekly overflows & during heavy rainfall, e.g. 32 M m3 of untreated sewage enters river



Solutions

  • 35 km of tunnelling

  • Sewage overflow capture

  • Transfer network for sewage treatment

  • Rail & utility crossing study

Contact

Frank Price

Director of Sustainability, UK/Ireland

Phone: +44 (0) 7879 432 428

Send mail